Question: b) Has the process been in control? Based on the developed control limits, the number of defectives has been in control or out of control?

b) Has the process been in control? Based on the

b) Has the process been in control?

Based on the developed control limits, the number of defectives has been in control or out of control?

c) If the sample size were 25 instead, how would your limits and conclusions change?

UCLp =? (enter your response as a number between 0 and 1, rounded to three decimal places).

LCLp = ?(enter your response as a number between 0 and 1, rounded to three decimal places).

Based on the developed control limits, the number of defectives has been IN-CONTROL or out of control?

PLEASE TELL ME HOW YOU SOLVE THESE QUESTIONS! I WANT TO LEARN HOW TO DO THIS CORRECTLY WITH MY NEW NUMBERS ON MY NEXT ATTEMPT. THANK YOU!!!.

.

Jamison Kovach Supply Company manufactures paper clips and other office products. Although inexpensive, paper clips have provided the firm with a high margin of profitability. Sample size is 50. Results are given for the last 10 samples. 2 3 4 5 6 7 8 9 10 Sample Defectives 1 5 7 3 5 6 6 5 5 2 11 The type of control chart that is best to monitor this process is p-chart . a) Establish the control limits to include 99.73% of the random variation in defectives. UCLP = 0.243 (enter your response as a number between 0 and 1, rounded to three decimal places). LCLP (enter your response as a number between 0 and 1, rounded to three decimal places)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!