Question: ( b ) In the re - development of the Kai Tak airport, a fill embankment of volume 6 0 , 0 0 0 m
b In the redevelopment of the Kai Tak airport, a fill embankment of volume and of void ratio of is to be built. To get the fill soil materials, two potential "borrow pits" were identified: Tsuen Wan site: insitu void ratio is and cost of transport is HK $; Ma On Shan site: insitu void ratio is and cost of transport is $ Which borrow pit should be used and what is the total cost?