Question: B. In what week do you need to start your castings As the production planner for Xiangling Hu Products, Inc., you have been given a

B. In what week do you need to start your castings
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 spring, and 3 clamps. The base is assembled from 1 clamp and 2 housings. Each clamp has 1 handle and 2 castings. Each housing has 2 bearings and 2 shafts. There is no inventory on hand. This exercise contains only parts b and c. The product structure is as follows: b) Determine the gross quantities needed of each item if you are to assemble 50 brackets. Base: units (enter your response as a whole number). Spring: units (enter your response as a whole number). Clamp: units (enter your response as a whole number). Housing: units (enter your response as a whole number). Handle: units (enter your response as a whole number). Casting: units (enter your response as a whole number). Bearing: units (enter your response as a whole number). Shaft: units (enter your response as a whole number). As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled from 1 clamp and 2 housings. Each clamp has 1 handle and 1 casting. Each housing has 2 bearings and 1 shaft. There is no inventory on hand. Click the icon to view the product structure. Your boss at Xiangling Hu Products, Inc., has just provided you with the schedule and lead times for the bracket. The unit is to be prepared in week 12 . The lead times for the components are bracket week), base (1 week), spring ( 1 week), clamp (1 week), housing ( 3 weeks), handle ( 2 weeks), casting ( 3 weeks), bearing (1 week), and shaft (1 week). a) Choose the correct time-phased product structure for the bracket
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
