Question: b ) The demand for the gear assembly for a period of 1 0 weeks is given below: Week 1 2 3 4 5 6
b The demand for the gear assembly for a period of weeks is given below:
Week
Demand
Currently there are gear assemblies on hand. Production is planned by using a fixed order period method of two periods. The lead time is two periods. Determine the planned order release schedule.