Question: B . Use these bills to determine the load for each of the next six weeks at both Lamination and Core Circuitize. The process centers

B. Use these bills to determine the load for each of the next six weeks at both Lamination and Core Circuitize. The process centers operate five days per week for three shifts per day (24 hours per day). Breaks and lunches are included in the unit hour data. There are six Lamination presses and eight expose machines (the bottleneck) in Core Circuitize.
Fill in the table below. (Hint: The load for the next six weeks is given by multiplying the value given in the bill of capacity by the requirements for the week and summing over the three board types for each processing center. For instance, in week one for lamination we have: (7474)(0.046)+(6489)(0.0462)+(3898)(0.048)=830.67. The time available for Lamination is given by (5 days/wk)(6 presses)(24 hr./day)=720 press hr./wk. Surplus (shortage) is computed by simply subtracting the load from the available.)
\table[[Week,1,2,3,4,5,6],[Trinity,7474,2984,5276,5516,3818,3048],[Pecos,6489,5596,7781,7781,3837,4395],[Brazos,3898,3966,6132,6132,5975,6051],[Lam Load,,,,,,],[Lam Available,,,,,,],[Surplus (Shortage),,,,,,],[Core Cir Load,,,,,,],[Core Cir Available,,,,,,],[Surplus (Shortage),,,,,,]]
 B. Use these bills to determine the load for each of

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!