Question: ( b ) You are doing a survey along Assignment Road using the plan below. REFERENCE MARKS PERMANENT MARKS In your survey you have the

(b) You are doing a survey along Assignment Road using the plan below.
REFERENCE MARKS
PERMANENT MARKS
In your survey you have the OIP off Stn 6, the PM off Stn 9 and the nail in concrete that was placed at
Stn 7. Using the field notes below calculate the position of the nail in concrete placed at Station 7 in
reference to the line 6-9.
( b ) You are doing a survey along Assignment