Question: B2 15. You are the engineer responsible for the design and installation of plumbing in a new elementary school under construction. The project is running

B2

B2 15. You are the engineer responsible for the design and installation

15. You are the engineer responsible for the design and installation of plumbing in a new elementary school under construction. The project is running behind schedule and above budget. The latest catch is that the supplier has not delivered the specified backflow preventers. Although a strike at the manufacturer's plant has been settled, the backorder list is moving slowly. The engineer serving as coordinator of the project orders you to obtain less expensive backflow preventers that are readily available from another manufacturer. These backflow preventers are of a lesser quality than those specified in the plans, have a history of occasional failure, and are likely to need earlier replacement. (2pts) The engineer should: (a) Order and install the available backflow preventers, but refuse to sign off on this portion of the job (b) Order and install the available backflow preventers, informing the school board that this equipment may not last as long but will help the project stay on schedule and closer to budget (c) Order and install the available backflow preventers and say nothing to the school board (d) Wait for the specified backflow preventers and explain your action to the school board

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Economics Questions!