Question: BA 357 Assignment 2 - Worksheet 3: Inventory Records and Lot-Sizing Rules Record Date: 31-Dec-15 Current Lead or Desired Inventory Assembly Safety Item Name On-Hand

 BA 357 Assignment 2 - Worksheet 3: Inventory Records and Lot-Sizing

BA 357 Assignment 2 - Worksheet 3: Inventory Records and Lot-Sizing Rules Record Date: 31-Dec-15 Current Lead or Desired Inventory Assembly Safety Item Name On-Hand Lot-Size Rule Lot Size Time Stock Level Units A ClodHopper 4500 FOO 2500 1 week 1000 B ClodBuster 3500 FOO 1000 1 Week 750 Handle Bar Assembly 3100 L4L 2 Weeks 700 Steel Tubing 1" dia 60.000 POO Period = 2 weeks 1 weeks 10.000 feet E Control cable 5.000 FOO 20.000 2 weeks 10.000 feet H Control lever assembly 2500 L4L 1 week G Grips 2000 L4L 1 week Powerhead assembly 700 FOO 4000 1 week 1000 Gearbox assembly FOO 5000 1 Week 750 Engine (Standard) 500 FOO 2500 2 weeks 750 Y Tiller blade unit 850 POO Period = 2 weeks 1 week 750 Engine (Heavy Duty) 450 FOO 1000 3 Weeks 500 M Instruction Manual 6000 FOO 10.000 3 weeks 2000 N HD Tiller Unit 1250 POO Period = 3 weeks 2 weeks 500 HD Powerhead assembly 900 FOO 2000 1 Week 250

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!