Question: Background Information A reverse curve is located on SR - 6 7 5 in a rural area of DeKalb County, AL between Milepost 2 5

Background Information
A reverse curve is located on SR-675 in a rural area of DeKalb County, AL between Milepost 25 and Milepost 26. The ADT of the segment is approximately 1900vpd and speed limit is 55mph.
Upon review of the segment crash data, it was determined that all crashes were occurring in a reverse curve approximately 2000 feet long, located approximately midway between Milepost 25 and Milepost 26.
The curve does not have any Horizontal Curve Series Warning signs and has not been evaluated for an advisory speed. The centerline and edge line striping is in fair condition. All crash vehicles are automobiles, unless otherwise noted.
Crash Data Summary
Crash data was analyzed for the segment between 11?12 and 12/21/14 at various points within the reverse curve and are as follows:
Fatality: 1 total. Single vehicle run-off-the road, at night, during wet weather
Type A: 3 total. 2 were single vehicle run-off the road crashes, and one was an opposite direction sideswipe. One of the run-off the road crashes occurred during wet weather and the other occurred at night. One of the vehicles involved in the opposite direction sideswipe was found to be traveling at 60mph through the curve.
Type B: 4 total, all single vehicle run-off the road crashes, 2 occurred during wet weather. 2 crashes occurred at night and 1 occurred at dawn.
Type C: 6 total, all single vehicle run-off the road crashes: 4 automobiles, 1 pick-up truck and 1 heavy truck. 3 of them during wet weather and 4 occurred at night.
PDO Crashes: 7 total. 2 involved heavy vehicles and the rest were automobiles. 5 crashes were single vehicle run-off the road crashes (3 during wet weather and 4 at night) and 2 were opposite direction side swipe (1 at night).
Based on the crashes, 4 countermeasures are considered:
Install the appropriate curve warning sign series (W1-4, W13-1p, and W 1-8) with Type XI sheeting (fluorescent sheeting). Total Cost: $3,700. Project life 10 years.
Renew the striping and install rpm's on the edge line and centerline. Total Cost: $4,000. Project life 5 years.
Renew striping, install rpm's, and install the curve warning sign series. Total Cost: $7,700. Project life 5 years.
Install a high friction surface treatment. Total Cost: $122,000. Project life 12 years.
a. Using the CMF Clearinghouse Website (
cmfclearinghouse.org), find the CRF's for each of the countermeasures
b. Based on your evaluation using the CMF's only, recommend the best option. (Look up necessary information and cite references if needed). Document all of your work and cite references.
c. What is the annual monetary benefits with the crash reductions for each of the countermeasures? Show your work.
Background Information A reverse curve is located

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!