Question: BACKGROUND QUESTION Using the Table, develop 10 concrete recommendations/suggestions for the project status and t he way forward. Use Table 1 below. Number Recommendation/Suggestion in

BACKGROUND

BACKGROUND QUESTION Using the Table, develop 10

BACKGROUND QUESTION Using the Table, develop 10

QUESTION

Using the Table, develop 10 concrete recommendations/suggestions for the project status and the way forward. Use Table 1 below.

Number

Recommendation/Suggestion in plain language to provide project status or the way forward but also cite data numbers or measures that you are using to support your suggestion

1

2

3

4

5

6

7

8

9

10

You have been serving as Electroscan's project manager and are now well along in the project. Develop a narrative status report for the board of directors of the chain store that discusses the status of the project to date (see Table C13.3) and at completion. Be as specific as you can, using the numbers given and those you might develop. Remember, your audience is not familiar with the jargon used by project managers and computer software personnel; therefore, some explanation may be necessary. Your report will be evaluated on your detailed use of the data, your total perspective of the current status and future status of the project, and your recom- mended changes (if any). TABLE C13.3 Electroscan, Inc. 555 Acorn Street, Suite 5 Boston, Massachusetts 29 In-store Scanner Project (thousands of dollars) Actual Progress as of January 1 Name PV EV AC SV CV BAC EAC Scanner project 420 395 476 -25 -81 915 1103 16 5 5 1 H 1.0 Hardware H 1.1 Hardware specifications (DS) H 12 Hardware design (DS) H 1.3 Hardware documentation (DOC) H 1.4 Prototypes (PD) H 1.5 Test prototypes (T) H 1.6 Order circuit boards (PD) H 1.7 Preproduction models (PD) OP 1.0 Operating system OP 1.1 Kernel specifications (DS) OP 1.2 Drivers OP 1.2.1 Disk drivers (DEV) OP 1.2.2 10 drivers (DEV) OP 1.3 Code software OP 1.3.1 Code software (C) OP 1.3.2 Document software (DOC) OP 1.3.3 Code interfaces (C) OP 1.3.4 Beta test software (T) U 1.0 Utilities U 1.1 Utilities specifications (DS) U 1.2 Routine utilities (DEV) U 1.3 Complex utilities (DEV) U 1.4 Utilities documentation (DOC) U 1.5 Beta test utilities (T) S 1.0 System integration S 1.1 Architecture decisions (DS) 92 20 30 10 2 0 30 0 195 20 45 25 20 130 30 45 55 0 87 20 20 30 17 0 46 9 88 20 30 6 2 0 30 0 150 20 55 30 25 75 20 30 25 0 108 20 20 60 8 0 49 9 72 15 25 5 2 0 25 0 196 15 76 45 31 105 40 25 40 0 148 15 35 90 8 0 60 7 -4 0 0 -4 0 0 0 0 -45 0 10 5 5 -55 -10 -15 -30 0 21 0 0 5 0 -46 5 -21 -15 -6 -30 -20 5 -15 0 -40 5 -15 -30 0 260 20 30 10 40 30 30 100 330 20 70 40 30 240 100 50 60 30 200 20 20 100 20 40 125 10 213 15 25 8 40 30 25 100 431 15 97 60 37 336 200 42 96 30 274 15 35 150 20 40 153 8 30 -9 omo -11 2 45 -15 S 1.2 S 1.3 S 1.4 S 1.5 Integration hard/soft (DEV) System hard/software test (U) Project documentation (DOC) Integration acceptance testing) 25 0 12 0 |o|o| 30 0 10 0 0 000 u 5 0 -2 0 ONO 50 20 15 30 20 12 30

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!