Question: Balance the following assembly operation using the GE algorithm so that the line is able to produce 20 units per month. (Assume the line will

Balance the following assembly operation using
Balance the following assembly operation using the GE algorithm so that the line is able to produce 20 units per month. (Assume the line will operate 160 hours per month) Immediate Task Time (hours) Predecessor a none b 6 none C N a d 6 a e 3 b. 3 b. c 00 d, e, f h 1 1. Determine the desired cycle time. 2. Draw the precedence diagram. 3. Balance the line using the GE algorithm 4. Determine the efficiency of the line