Question: Based on the above table determine the total waste cost per production resource and process. The standard labor capacity is 3 hours per 200 lb.
| Based on the above table determine the total waste cost per production resource and process. | ||||||||
| The standard labor capacity is 3 hours per 200 lb. |
|
|
|
|
| |||
| The standard machine capacity is 1.5 hours per 100 lb including loading and unloading operations. | ||||||||
| The downtime cost is $150/hr. |
|
|
|
|
|
| ||
| The material cost is $65/lb. |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| After determine the resource (labor, material, equipment) cost, select the major offender resource. NO ANSWER IN PICTURE, POST INFORMATION BELOW | ||||||||
\begin{tabular}{|l|l|l} \hline Operation & Duration & QTY \\ \hline & & \\ \hline Transfer material from carts. & 25min & 300lbs \\ \hline & & \\ \hline Load machine & 30min & 300lbs \\ \hline & 350min & 300lbs \\ \hline Machine process & & \\ \hline & 20min & 245lbs \\ \hline Unload machine & & \\ \hline & 25min & 245lbs \\ \hline Inspect product & & \\ \hline & 20min & 245lbs \\ \hline Waiting for release product & & \\ \hline & 35min & 245lbs \\ \hline Transfer product & & \\ \hline & 30min & 245lbs \\ \hline Storage product. & & \\ \hline \end{tabular}