Question: Based on the cost, the process that is best suited for the current contracted volume is: DM/FMS/GPE? Meile Machine Shop, Inc., has a 1-year contract

Based on the cost, the process that is best suited for the current contracted volume is: DM/FMS/GPE?
Meile Machine Shop, Inc., has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle. Owner Larry Meile hopes the contract will be extended and the volume increased next year. Meile has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Flexible Manufacturing Equipment (GPE) System (FMS) 200,000 Dedicated Machine (DM) Annual contracted units 200,000 200,000 Annual fixed cost $200,000 $500,000 $100,000 $15.00 Per unit variable cost $14.00 $13.00 Based on the cost, the process that is best suited for the current contracted volume isStep by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts