Question: Based on the information in the box, conduct MRP (Material Requirements Planning) under Lot-for-Lot policy Note: Please download and complete the MRP sheet attached(MRP exam

Based on the information in the box, conduct MRP
Based on the information in the box, conduct MRP
Based on the information in the box, conduct MRP (Material Requirements Planning) under Lot-for-Lot policy Note: Please download and complete the MRP sheet attached(MRP exam template Single template.xlsx), and upload your completed MRP sheet for your answer, Each shutter consists of three slatted wood sections and two frames A firm that produces wood shutters has received two orders: one for 150 shutters (week 5) and one for 180 shutters (week 9) The wood sections are made by the firm, and fabrication takes 2 weeks The frames are ordered, and lead time is 1 week Assembly of the shutters requires 1 week There is a scheduled receipt of 85 wood sections in li.e. at the beginning of) week 1. 2 3 5 6 7 8 Week Num 1 Master Schedule Quantity Shutter Gross requirements Scheduled receipts Quantity - Projected on hand LT = Net requirements Lot Size = Planned-order receipts On hand - Planned-order releases Frames Gross requirements Scheduled receipts Quantity = Projected on hand LT - Net requirements Lot Size = Planned-order receipts On hand Planned-order releases Wood Sect Gross requirements Scheduled receipts Quantity = Projected on hand LT - Net requirements Lot Size = Planned-order receipts On hand Planned-order releases

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!