Question: Based on the scraper specifications in Table 8 . 1 and on the performance charts in Figures 8 . 8 and 8 . 9 ,

Based on the scraper specifications in Table 8.1 and on the performance charts in Figures 8.8 and 8.9, and for haul. conditions as stated here, analyze the probable scraper production. How many scrapers should be used and what will be the production in bcy per hour? The material to be hauled is a dry clay. It has a unit weight of 3,000lbbcy. The expected rolling resistance for the haul road is +4%. Assume a 0.85-min load time and that average load of 86% heaped capacity. Acceleration and decelerate at an average speed of 6mph over a distance of 300ft. Use a 45-min hour efficiency factor. The total length of haul is 3,400ft and has the following individual segments when moving from cut to fill:
700 ft @ +3% grade; 800 ft @ +2% grade; 1,900ft @ 0% grade
Based on the scraper specifications in Table 8 .

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!