Question: Boats Ltd make two products Front Engine and Back Engine. The budgeted cost are as follows: Weekly Overheads are: Staff costs of ( 6

Boats Ltd make two products Front Engine and Back Engine. The budgeted cost are as follows:
Weekly Overheads are:
Staff costs of \(6,000\) per week do not vary with the production activity.
The products are manufactured in batches of 60 units per batch. A Front Engine is made from 15 separate items, so 15 material orders are needed for each batch produced.
A Back Engine is made from 20 separate items, so 20 material orders are needed for each batch produced.
Required:
Calculate the activity based cost per unit of cost driver consumed.
Do NOT insert a \(\) symbol. Do NOT use a comma to denote thousands.
- Cost per batch: \(\)
- Cost per order: \(\)
- Cost per machine hour: \(\)
Boats Ltd make two products Front Engine and Back

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!