Question: BOE Manufacturing is trying to decide between two different conveyor belt systems. System A costs $260,000, has a four-year life, and requires $80,000 in pretax

BOE Manufacturing is trying to decide between two different conveyor belt systems. System A costs $260,000, has a four-year life, and requires $80,000 in pretax annual operating costs. System B costs $366,000, has a six-year life, and requires $74,000 in pretax annual operating costs. Suppose BOE always needs a conveyor belt system; when one wears out, it must be replaced. Assume the tax rate is 30 percent and the discount rate is 9 percent. Calculate the EAC for both conveyor belt systems. Which conveyor belt system should the firm choose? System A System B