Question: Build a simulation model using Simul 8 for a five - machine - four - buffer production line. The machines all have processing time o

Build a simulation model using Simul8 for a five-machine-four-buffer production line. The
machines all have processing time of exactly 1 min (fixed constant). The up- and downtimes of
the machines all follow exponential distribution with MTBF=40 min and MTTR=10 min.
Each buffer has capacity of10.