Question: Build the spreadsheet model and use the solver to solve the maximum flow problem. Exxo 76 is an oil company that operates the pipeline network
Build the spreadsheet model and use the solver to solve the maximum flow problem. Exxo 76 is an oil company that operates the pipeline network shown below, where each pipeline is labeled with its maximum flow rate in million cubic feet (MMcf) per day. A new oil well has been constructed near A. They would like to transport oil from the well near A to their refinery at G. Formulate and solve a network optimization model to determine the maximum flow rate from A to G.
Please solve it in excel and send me a screenshot step by step and also use the solver
Step by Step Solution