Question: buppose that the engineering department has proposed a process design change that will increase the polishing time for Frame X from 15 to 23 minutes

buppose that the engineering department has proposed a process design change that will increase the polishing time for Frame X from 15 to 23 minutes per unit and decrease the welding time from 15 minutes to 113 minutes per unit (for Frame X). The cost of process redesign would be $13,030. How long would it take to \"break even" if the process redesign were to go ahead? Should the proposal be accepted? What step in the TOC process does this proposal represent