Question: By resolving the question on the photo it resolves the other questions A) Calculate the % utilization. B) Calculate the total normal time in minutes
Operation Description Assemble muffler clamp-2 at a time Activity Left Hand Get and place "U" bolt Get and assemble bracket and 2 washers Activity Time in Minutes Right Hand 0.05 Get and place "U" bolt 0.10 0.15 Get and assemble bracket and 2 washers 0.20 0.25 0.30 Get and asemble 2 nuts - run down 8 0.34 Aaside complted unit Get and asemble 2 nuts - run down 8 Aaside complted unit hint (assemble muffler clamp-2 at a time) Calculate the total utilization. 0.36 0.17 0.70 0.34 Operation Description Assemble muffler clamp-2 at a time Activity Left Hand Get and place "U" bolt Get and assemble bracket and 2 washers Activity Time in Minutes Right Hand 0.05 Get and place "U" bolt 0.10 0.15 Get and assemble bracket and 2 washers 0.20 0.25 0.30 Get and asemble 2 nuts - run down 8 0.34 Aaside complted unit Get and asemble 2 nuts - run down 8 Aaside complted unit hint (assemble muffler clamp-2 at a time) Calculate the total utilization. 0.36 0.17 0.70 0.34
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts