Question: By resolving the question on the photo it resolves the other questions A) Calculate the % utilization. B) Calculate the total normal time in minutes

By resolving the question on the photo it resolves the other questions
A) Calculate the % utilization.
B) Calculate the total normal time in minutes per unit.
C) Calculate the allowance (+10% allowance).
D)Calculate the standard time.
E) Calculate the hours per unit.
F) Calculate the pieces per hour.
G) calculate the dollars per hour=7.50
By resolving the question on the photo it resolves the other questions

Operation Description Assemble muffler clamp-2 at a time Activity Left Hand Get and place "U" bolt Get and assemble bracket and 2 washers Activity Time in Minutes Right Hand 0.05 Get and place "U" bolt 0.10 0.15 Get and assemble bracket and 2 washers 0.20 0.25 0.30 Get and asemble 2 nuts - run down 8 0.34 Aaside complted unit Get and asemble 2 nuts - run down 8 Aaside complted unit hint (assemble muffler clamp-2 at a time) Calculate the total utilization. 0.36 0.17 0.70 0.34 Operation Description Assemble muffler clamp-2 at a time Activity Left Hand Get and place "U" bolt Get and assemble bracket and 2 washers Activity Time in Minutes Right Hand 0.05 Get and place "U" bolt 0.10 0.15 Get and assemble bracket and 2 washers 0.20 0.25 0.30 Get and asemble 2 nuts - run down 8 0.34 Aaside complted unit Get and asemble 2 nuts - run down 8 Aaside complted unit hint (assemble muffler clamp-2 at a time) Calculate the total utilization. 0.36 0.17 0.70 0.34

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!