Question: C A = Maximum Capacity of Machine A ( units / hour ) = 2 ; Consider the following two - machine manufacturing facility B
Maximum Capacity of Machine
units hour;
Consider the following twomachine manufacturing facility
Maximum Batch Size machine A
can handle: units;
Maximum Capacity of Machine
units hour;
Maximum Batch Size machine B
can handle: units
Machine A produces an intermediate product that can be sold directly to the market at
a price $ per unit. However, a unit can receive additional processing on machine B to
get a higher quality product that is sold at $ dollars per units. When machine
produces its units it can produce up to units simultaneously its maximum batch size in
a fixed amount of time and when machine B processes its units, it can process up to
units simultaneously its maximum batch size in a fixed amount of time. From the data
concerning the maximum capacity and the maximum batch size, you can compute how
much time it would take to produce a batch in each one of the two machines. Of course,
the maximum capacity can only be achieved with full batch sizes.
a Points If the company decide to produce product exclusively shut
down machine B
What is the capacity of the system, and what is the throughput time
flow time for units of product
How much total revenue will there be after hours of production?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock