Question: (C) Assume 500 instructions are executed using a four-stage pipeline. Each stage requires 1 clock cycle and each clock cycle lasts 2 nanoseconds. Andaikan suatu

 (C) Assume 500 instructions are executed using a four-stage pipeline. Each

stage requires 1 clock cycle and each clock cycle lasts 2 nanoseconds.

(C) Assume 500 instructions are executed using a four-stage pipeline. Each stage requires 1 clock cycle and each clock cycle lasts 2 nanoseconds. Andaikan suatu atur cara dengan 500 suruhan dilaksanakan pada talian paip suruhan dengan 4 tahap. Setiap tahap memerlukan 1 kitaran jam yang mengambil masa 2 nanosaat Calculate the speedup ratio. What is the maximum speedup that can be achieved? Kirakan nisbah "speedup". Apakah nilai "speedup" maksimum yang boleh dicapai. 0 4001 2000 cycle total (3/100) e lop 503 cycles total SULIT CST 131 -6- 10% of the instructions are branch instructions. 40% of the branch instructions were taken what is the speedup ratio of the pipeline now. 10% daripada suruhan itu mesti dilaksanakan secara berujukan. Apakah nilai nisbah speedup talian paip apabila 40% daripada suruhan yang diambil adalah bercabang (4/100)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!