Question: ( c ) On an ODOT project where the minimum required relative compaction is 9 5 % within 2 % of optimum, a field density

(c) On an ODOT project where the minimum required relative compaction is 95% within 2% of optimum,
a field density test revealed a moist density of 128.3 pcf and a moisture content of 9.7%. The lab's
Proctor test showed a maximum dry unit weight of 125.0 pcf and an optimum moisture of 10.2%.
What is the relative compaction?
Did the grading contractor achieve the project specifications?
What advice would you give to the contactor?
( c ) On an ODOT project where the minimum

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!