Question: Calculate concrete mix component quantities. A project requires 7 5 0 C Y of concrete that will be mixed on - site. Each cubic yard

Calculate concrete mix component quantities. A project requires 750CY of concrete that will be
mixed on-site. Each cubic yard of this mix requires the following:
The sand and gravel will be sourced from a yard that has sand with 5% excess moisture and
gravel with 3% excess moisture. Specific gravity values: cement=3.15, gravel=2.65, sand=2.65,
and water =1.0.1-sack of cement is 94lbs. Density of water =62.4lbscuft.
a. What is the density (in lbft3) of this concrete?
b. What is the volume of air (in %)?
c. What quantity (in tons) of sand should be ordered?
d. What quantity (in tons) of gravel should be ordered?
Calculate concrete mix component quantities. A

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!