Question: Calculate Lead Time Williams Optical Inc. is considering a new just-in-time product cell. The present manufacturing approach produces a product in four separate steps. The

 Calculate Lead Time Williams Optical Inc. is considering a new just-in-time

Calculate Lead Time Williams Optical Inc. is considering a new just-in-time product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 40 units. The process time for each step is as follows Process Step 1 6 minutes Process Step 2 10 minutes Process Step 3 6 minutes Process Step 4 8 minutes The time required to move each batch between steps is 8 minutes. In addition, the time to move raw materials to Process Step 1 is also 8 minutes, and the time to move completed units from Process Step 4 to finished goods inventory is 8 minutes just-in-time layout will allow the company to reduce the batch sizes from 40 units to 5 units. The time required to move each batch between steps and the inventory The new locations will be reduced to 2 minutes. The processing time in each step will stay the same Determine the value-added, non-value-added total lead times, and the value-added ratio under the present and proposed production approaches. If required, round percentages to one decimal place. Present Approach Proposed Approach Value-added time min min Non-value-added time min min Total lead time min min Value-added ratio (as a percent)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!