Question: calculate the loaded cost slabor for the project team using the following date 12 Hours Overhead Hourly Personal time Fully loaded labor Name needed charge

calculate the loaded cost slabor for the project

calculate the loaded cost slabor for the project team using the following date 12 Hours Overhead Hourly Personal time Fully loaded labor Name needed charge rate rate cost A 50 1.35 25 1.12 B 75 1.45 45 1.12 70 1.45 40 1.12 11918.20 10641.25 DOO Second O 1.687.50