Question: calculate the MRP record for the following component using EOQ and PPB lot sizing rules with a carrying cost per unit per period and with
calculate the MRP record for the following component using EOQ and PPB lot sizing rules with a carrying cost per unit per period and with a set up cost of $100 per replenishment. Also, calculate the total cost for each policy Ordering in multiples is allowed.
| Item: X Low-Level Code: 0 Lot size: EOQ Lead Time: 0 | 1 | 2 | 3 | 4 | 5 |
| Gross requirements | 60 | 40 | 25 | 5 | 100 |
| Schedule receipts | |||||
| Project balance |0 | |||||
| Net requirements | |||||
| planned Order Receipts | |||||
| Planned Order Release |
LLC = 0, LT=0, SS=0, Lot Size=PPB
| Item: X Low-Level Code: 0 Lot size: PPB Lead Time: 0 | 1 | 2 | 3 | 4 | 5 |
| Gross requirements | 60 | 40 | 25 | 5 | 100 |
| Schedule receipts | |||||
| Project balance |0 | |||||
| Net requirements | |||||
| planned Order Receipts | |||||
| Planned Order Release |