Question: Calculate the uplift pressure distribution and plot it , then determine the total resultant force along with its location. Use below information: Waterhead on the

Calculate the uplift pressure distribution and plot it, then determine the total resultant force along with its location.
Use below information:
Waterhead on the right hand -3.6m
Waterhead on the left hand -0m
Dam length -20m
Hydraulic conductivity of soil -4.810-6msec
Hydraulic conductivity of concrete -0
Saturated Density of soil -2056kgm3
Saturated Density of concrete -2400kgm3
Total Seepage rate -1.305610-6m3secm
Total pumping capacity -1.2807910-2kgs.
If any assumptions are made please define them.
Calculate the uplift pressure distribution and

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!