Question: CalculateEVM information from the data provided using the Electroscan, Inc. Student Table spreadsheet and then draw conclusions regarding the status of the project in the

CalculateEVM information from the data provided using the Electroscan, Inc. Student Table spreadsheet and then draw conclusions regarding the status of the project in the case study. Drawconclusions regarding project health from the Earned Value analysis. Analyzethe effects of given schedule variances as well as SPI, CPI, EAC, TCIP, and any other EVM analytical products they deem valuable. Writeyour findings in a three fifty to seven word memorandum. Clickthe Assignment Files tab to submit your assignment.

You have been serving as Electroscan's project manager and are now well along in the project. Develop a narrative status report for the board of directors of the chain store that discusses the status of the project to date and at completion. Be as specific as you can using numbers given and those you might develop. Remember, your audience is not familiar with the jargon used by project managers and computer software personnel; therefore, some explanation may be necessary. Your report will be evaluated on your detailed use of the data, your total perspective of the current status and future status of the project, and your recommended changes (if any).

Electroscan, Inc. 20 In-Store Scanner Project 555 Alcorn Street, Suite 5 (thousands of dollars) Boston, Massachusetts Actual Progress a/o January 1 NAME PV EV AC SV CV BAC EAC Scanner Project 420 395 476 -25 -81 915 1128 H 1.0Hardware 92 88 72 -4 16 260 243 H 1.1Hardware Specifications (DS) 20 20 15 0 5 20 15 H 1.2Hardware Design (DS) 30 30 25 0 5 30 25 H 1.3Hardware Documentation (DOC) 10 6 5 -4 1 10 8 H 1.4Prototype (PD) 2 2 2 0 0 40 40 H 1.5Test Prototypes (T) 0 0 0 0 0 30 30 H 1.6Order Circuit Boards (PD) 30 30 25 0 5 30 25 H 1.7Preproduction Models (PD) 0 0 0 0 0 100 100 OP 1.0Operating System 195 150 196 -45 -46 330 480 OP 1.1Kernel Specifications (DS) 20 20 15 0 5 20 15 OP 1.2Drivers 45 55 76 10 -21 70 97 OP 1.2.1Disk Drivers (DEV) 25 30 45 5 -15 40 60 OP 1.2.2I/O Drivers (DEV) 20 25 31 5 -6 30 37 OP 1.3Code Software 130 75 105 -55 -30 240 368 OP 1.3.1Code Software ( C ) 30 20 40 -10 -20 100 200 OP 1.3.2Document Software (DOC) 45 30 25 -15 5 50 42 OP 1.3.3Code Interfaces ( C ) 55 25 40 -30 -15 60 96 OP 1.3.4Beta-Test Software (T) 0 0 0 0 0 30 30 U 1.0Utilities 87 108 148 21 -40 200 260 U 1.1Utilities Specifications (DS) 20 20 15 0 5 20 15 U 1.2Routine Utilities (DEV) 20 20 35 0 -15 20 35 U 1.3 Complex Utilities (DEV) 30 60 90 30 -30 100 150 U 1.4Utilities Documentation (DOC) 17 8 8 -9 0 20 20 U 1.5Beta-Test Utilities (T) 0 0 0 0 0 40 40 S 1.0System Integration 46 49 60 3 -11 125 145 S 1.1Architecture Decisions (DS) 9 9 7 0 2 10 8 S 1.2Integration Hard/Soft (DEV) 25 30 45 5 -15 50 75 S 1.3System Hardware/Software Test (T) 0 0 0 0 0 20 20 S 1.4Project Documentation (D)C 12 10 8 -2 2 15 12 S 1.5Integration Acceptance Testing (T) 0 0 0 0 0 30 30

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!