Question: CALCULATOR MESSAGE TO FULLSHIT BATM Waterways Problem 04 - (Part Level Submission) Direct labor or machine hours may not be the appropriate cost driver for


CALCULATOR MESSAGE TO FULLSHIT BATM Waterways Problem 04 - (Part Level Submission) Direct labor or machine hours may not be the appropriate cost driver for overhead in arms of manufacturing due to the complexities of many manufacturing process. Many companies activity based costing (ABC) which uses multiple drivers (items that consume resources) rather than just one driver to apply overhead to the activities With ABC, a company cant contre that has a direct cust/effect relationship in its applied overhead costs. Waterways looked into ABC as a method of costing because of the variety of items it produces and the many different activities in which it is molved. The listed beow area complet possible cost pools for Waterways ly Assembling Payrol Biling Plant supervision Digging trenches Product design Janitorial Purchasing materials Machine maintenance Seting Machine setups Testing Molding Welding Packaging (b) Using the following information, determine the overhead rates and the actual cost assigned for each of the activity cost pools in a possible ABC wystem for Waterways Cound answers to 2 decimal places. 12.25.) WATERWAYS CORPORATION Expected Use of Cost Activity Cost Estimated Drivers per Actual Use of Pools Cost Drivers Overhead Activity Drivers Labor cost Irrigation Installation $1,948,650 11,791 11,810 MESSAGE MY INSTRUCTOR PULLER PRINT VERSI BACK Using the following information, determine the overhead rates and the actual cost assigned for each of the activity cost pools in a pouble ABC system for waterway found answers to 2 decimal places, ... 12.25.) WATERWAYS CORPORATION Expected Activity Cost Use of Cost Estimated Drivers per Actual Use of Pools Cost Drivers Overhead Activity Drivers Irrigation installation Labor cost $1,948,650 11,010 11,791 Machining (al machine use) Machine hours 1,511,600 30,232,000 30,233,000 Customer order Number of orders 25.960 2.360 2,129 Shipping none (direct) NA NA traced direly Design Cost per design 864 9 Selling Number of sales calls 364,000 22.000 22,980 WATERWAYS CORPORATION Activity Based Activity Cost Overhead Pools Rates Actual Cost Assigned Irrigation Installation Machining Coll machine use) Customer orders Design CALCULATOR 864 9 8 Design Selling Cost per design Number of sales calls 364,800 22,800 22,980 WATERWAYS CORPORATION Activity- Based Activity Cost Overhead Pools Rates Actual Cost Assigned Irrigation installation Machining (all machine use) Customer orders Design Selling The parts of this question must be completed in order. This part will be available when you complete the part above
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
