Question: can I get some help with question #4 please It is the 2 pages at the top, please check the question numbers and page numbers

can I get some help with question #4 please It is the 2 pages at the top, please check the question numbers and page numbers
quality assurance
117 IB 119 lo 6 o 52 33 2 1 Ra Question 4 marks A wiring harness manufacturer uses high-speed machinery to cut wires to a predetermined length and install terminals on the ends of wires. These products are basically all the same the wire is brass with an insulation coating and the terminals installed on the wire are made of brass. The length and diameter of the wire and the same for all sizes and shapes. The floor inspector makes a tour of the machines and visually inspects the output of the machines that are running at that time. One hundred pieces are inspected visually at each machine that is running and the number of defects found in the sample is recorded. If the machine is not running the record is left bank. The inspector would like to create a c chart of the data from the last machine on the line to check its performance 26 7 8 129 1 210 Sussies including red for a show stossed to solve equat maka the race but with the wrong swer the manalo them in question in the proper location. You can submit and we even though conterrogare Ware. Excalithium Ioduly please emri ilegal Aisi beated on data enton and the completeness and correctess of results sectia Found Machine 6 10 ha lo 11 2 13 14 0 P Assignment 1 Question marks Four pieces were taken from a lathe operation at fifteen minute intervals. The dimension measured an undercut diameter on a baljon stud. The specifications.750.00. Determine the trial central line and controllimits for the variable control chart (I & RI. If any points are out of control, assume assignable causes, and determine the revised limits and central line. Complete the following ustions based on what you have learned from chapter 15 and 18 of your textbook Question 15 mars A hole location dimension was measured on fity-five pieces taken from an operation. The Nadings were as shown below. For the frequency histogram of the measurements. Is there anything wrong with this data? je pos 755 24 730 296 754 755 1:33 1:45 1753 10 754 TT 8754 134 733 755 353 257 2:15 130 1758 754 755 1954 1756 40.440.840,340.00 410.640.5 40.740.440.840,4 40.5 40.441.040.440.5 40.5 40.0.40.440.94.140.6 40.440.70 340.8 40.440.5 40.5 40.940-440.840.4 0.5 40.440740 440.840.240.740.441.040.440.6 40.340.8403 40.6.40.440.5 40.241.040 540.31 250 354 6 757 797 30 8.00 14.15 9-10 LHS Les 750 351 757 757 76 8.00 IS 10:30 10:45 11:00 355 352 353 956 351 352 355 755 752 754 754 T4 1752 736 714 1356 352 358 252 1756 1356 L751 745 750 755 Question 2 15 marks Determine the average median, mode range, and standard deviation for each group of numbers 07:10 TO 12:00 NO M a S0, 45, 55, 55, 45, 50, 55, 45, 55 0 89, 87, 88, 83, 86, 82.54 I 11, 17, 14, 12, 12, 14, 14, 15, 17.17 16, 25, 18, 17, 19, 21, 14 c) 45.39, 42, 42, 43 756 799 25 757 754 1756 11:45 12.00 749 758 24 750 754 750 755 75B 11:45 749 749 -750
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts