Question: Can someone help me with bumber 3? i do not know if i did it right, i also dont know how to find 3. d.

Can someone help me with bumber 3? i do not know if i did it right, i also dont know how to find 3. d.
Can someone help me with bumber 3? i do not know
3. A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 60/24-25min 60/2 = 30 min Assembly 2.4 units/hr 2 units/hr 1 60/07= 0.7 units/hr Sawing Sanding 85.71min Welding Assembly 19 x 5 units/hr 0.7 units/hr Drilling 601512min 5 units/hr Assembly 60/5= 12 min 0.7 units/hr a. Which operation is the bottleneck? b. The bottleneck time is X5,7 minutes per unit (round your response to two decimal places) C. The throughput time of the overall system is 150. + minutes (round your response to two decimal places). d. If the firm operates 10 hours per day, 20 days per month, the monthly capacity of the manufacturing process is_ units (enter your response as a whole number)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!