Question: can you answer the blanks please Exercise 5-28 (Algo) Methods of Estimating Costs: Engineering Estimates (LO51,2) Ferdinand Construction (FC) manages the design and construction of

can you answer the blanks please
can you answer the blanks please Exercise 5-28 (Algo) Methods of Estimating
Costs: Engineering Estimates (LO51,2) Ferdinand Construction (FC) manages the design and construction
of hospitals. Ferdinand has developed several formulas that it uses to quote

Exercise 5-28 (Algo) Methods of Estimating Costs: Engineering Estimates (LO51,2) Ferdinand Construction (FC) manages the design and construction of hospitals. Ferdinand has developed several formulas that it uses to quote jobs. These include costs of basic construction but exclude equipment and furniture. These estimates are also dependent on the purpose of the hospital (teaching hospitals are more costly to bulid) and location (downtown hospitals are more costly to build). Both of these are based on the building costs. The estimated costs also depend on whether the hospital has few or many stories (highrise buildings are more expensive). The following are the cost estimates for one region in the Northeast: Required: A local university medical school has asked Ferdinand Construction to provide a quote on a high-rise teaching hospital located in the city center downtown. The university estimates the hospital will be 312,000 square feet in total. Based on the engineering estimates above, what will such a hospital cost to build? Note: Enter your answers in thousands. Kirby Fasteners supplies the electronics industry with accessories for cases, disc enclosures, and so on. Below are the costs and volumes for the past six months at its Plant number 6 ; Required: a. Use the high-low method to estimate the monthly fixed cost of production and the variable cost of production per unit. b. Kirby analysts forecast a production level of 11,800 units in July. Based on the results from requirement (a), what would be the estimated production costs in July? Complete this question by entering your answers in the tabs below. Use the high-low method to estimate the monthly fixed cost of production and the variable cost of production per unit. Note: Round "Variable cost" answer to 2 decimal places. Complete this question by entering your answers in the tabs below. Kirby annlysts forecast s production level of 11,800 units in tuly. Based on the hasults from requirement (a), what would be the estimbted production oosts in July? Notes Pound "Varibble cost" to 2 decimel places

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!

Q:

\f