Question: can you please show the work on how to solve 22d and 23c?? 23. (10 points) A steel rolling mill can produce l-beams at the

can you please show the work on how to solve 22d
can you please show the work on how to solve 22dcan you please
show the work on how to solve 22d and 23c??
23. (10 points) A steel rolling mill can produce l-beams at the rate of 60,000 tons per year. Annual customer demand for the beams is 30,000. For each production run of I-beams, the mill must go through a setup that costs $20,000. I-beams cost the mill $3000 per ton, and the mill has an annual holding cost of 20%. a. What is the optimal production batch size for I-beams? Optimal production batch size = 2 000 b. With the batch size you found in part a, find the following quantities. Average inventory level = 5 00 Number of setups per year = 15 Annual Inventory Cost = $300 000 Annual Setup Cost = $300000 Total (setup + holding) Cost = $600000 c. Management has decided that they do not like the production batch size you found in part a. Instead, they would like to use a production batch size of 1600. What would the setup cost need to be in order to make the optimal batch size equal to 1600? $200 Setup cost to make 1600 the optimal lot size: Points on This Page 22. (10 points) Weekly demand for gaming consoles at Liverpool, a Mexican department store chain, is normally distributed with a mean of 1000 and a standard deviation of 400. Replenishment lead time is 4 weeks, and they use a periodic review policy where an order is placed every 12 weeks. a. To achieve a CSL of 67%, how much safety stock should Liverpool maintain? Safety stock for 67% CSL = 704 b. What order-up-to level should Liverpool use to achieve a CSL of 67%? Order-up-to level for 67% CSL = 16704 c. Suppose that Liverpool uses the recommended order-up-to level that you found above. If today is an order day and they currently have 2000 consoles in stock, how many consoles should be ordered? Number of consoles to order = 14704 d. A manager just returned from a supply chain conference, and she advocates switching to a continuous review policy. If Liverpool has the same lead time (4 weeks) and CSL (67%) as above, how much safety stock would be required if they switch to a continuous review policy? Safety stock for 67% CSL using continuous review = iew: 352 5 Points on This Page /10

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!