Question: can you pleease anwer this with step by step procedure. organized as possible 2. A plant has three operators to be assigned to four machines.

can you pleease anwer this with step by step procedure. organized as possible can you pleease anwer this with step by step
2. A plant has three operators to be assigned to four machines. The time in minutes required by each operator to manufacture a product on each machine it is shown in the following table. a. Determine the optima assignment the operators to machine b. Compute the minimum total cost Z c. What means a dummy in this problem? OPERATORS MACHINES X Y N XX 1 1 1 3 3 3 N 9 2 5 1 3 5 5 2 9 1