e five departments of the plant. A day consists of 8 hours. Loading and unloading times per delivery are 2.25 and 2.00 minutes, respectively. The loaded vehicle velocity is assumed to be 0.75m/sec, and the empty vehicle velocity is taken as 0.90m 'sec Availability is assumed as 92%, and workers are 85% efficient. The anticipated traffic factor is 90%. Draw the network diagram of the system. How many forklifts will be required to operate this system: a. If the forklifts never travel unloaded (empty)? b. If the unloaded distance that the forklifts travel is equal to their loaded distance? Dosyanz bulmak iin "Gozat" seeneine ve yoklemek in "Yukle" seenegine tiklayn, (En buyyuk dosyo boyutu: 40MB) Dosya seilmedi