Question: Can't figure out how to do it correctly. Complete the time study by filling in the circles. Then, calculate a standard time for an 8-h
Can't figure out how to do it correctly.
Complete the time study by filling in the circles. Then, calculate a standard time for an 8-h job. Assume a 10 percent allowance. Calculate the equivalent in TMUs of 0.0075 h per piece, 0.248 min per piece, 0.0622 h per hundred, 0.421 s per piece, and 10 pieces per minute. Develop a BasicMOST analysis of the paper sequence of activities in Figure 13.20. Complete the time study by filling in the circles. Then, calculate a standard time for an 8-h job. Assume a 10 percent allowance. Calculate the equivalent in TMUs of 0.0075 h per piece, 0.248 min per piece, 0.0622 h per hundred, 0.421 s per piece, and 10 pieces per minute. Develop a BasicMOST analysis of the paper sequence of activities in Figure 13.20