Question: Careful consideration must be given to the design and development of the WBS . The work breakdown structure can be used to provide the basis

Careful consideration must be given to the design and development of the WBS. The work breakdown structure can be used to provide the basis for:
Network scheduling
The responsibility matrix
All the options are correct
Risk analysis