Question: Case Description: ElectroTech S . A . is facing efficiency problems on its electronics assembly line. Management has decided to hire a time engineer to
Case Description: ElectroTech SA is facing efficiency problems on its electronics assembly line. Management has decided to hire a time engineer to analyze the process and propose improvements.
Developing Standard Data and Time Formulas: Choose a specific activity on the assembly line for example, assembling an electronic component
Conduct a time study for this activity, recording the time for at least cycles.
Calculate the standard time based on the data collected.
Give a conclusion and a recommendation based on the results.
Work Sampling and Control Charts: Select a section of the assembly line and perform sampling work for one hour
Create a control chart using the sampling data.
Analyze the control chart and identify possible areas for improvement.
Give a conclusion and a recommendation based on the results.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
