Question: Case Study In a recent development for the next 50 years, SEB Smart Eco Building, are given an engineering task to construct Eco smart building

Case Study In a recent development for the next 50 years, SEB Smart Eco Building, are given an engineering task to construct Eco smart building in figure 1. The building needs to satisfy the following requirements given by the commissioning authority, with Smarter, Healthier Buildings. The building does not have any drawing or operation manual for planning According to the American company, the manufacturer is looking for an ideal interdisciplinary design project that can be a best fit solution to all users. The American Engineering company has organized an engineering design competition for a team of engineers to present a best fit design using design constraints. Sr. No. Criteria Indicator Comments 1 Design = Extremely creative showing a sustainable building (nature inspired designs) which is similar to available Models design constraints 2 Sustainable System = Should have Key for System integration 3 Raw materials = Any nature-based materials Key design parameter 5 Material Alternative = Use Eco materiel Alternative materials 6 Add on feature = Some new technologies added. Added features Table 1: Design Constraints The customers suggested the design for real-time building health data highlights smart building technology as a foundational element for healthy building upgrade

Task 1

Considering the above scenario, the engineer should design and make a prototype and presentation with design parameters recording of material selection for parts in a finished component, identifying the design and manufacturing process for each component. [Note: The engineers should use design process, inter-relation between materials, design and modern manufacturing methodology] This provides evidence for [CLO 1&2]

Task 2

Considering the above scenario, the engineer should redesign the prototype with alternative material and make a presentation with description of complete manufacturing system designed to make the solution. [Note: The engineers should discuss the constraints and manufacturing techniques to integrate a system with a plan to the improve by reverse engineering techniques] This provides evidence for [CLO 3&4]

Task 3

Considering the above scenario, the engineer should compare the design tested prototype and the virtual re- designs and explain the relationship of the model to the real design. [Note: The engineers can use re-design process of sustainability model, explain virtual re-designing techniques and inter-relation between virtual and final re-design] This provides evidence for [CLO 5, 6]

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!