Question: Case Study: Moses Mabhida Stadium Moses Mabhida Stadium is an iconic multipurpose stadium in Durban, KwaZulu - Natal and is shaped like a basket. It

Case Study: Moses Mabhida Stadium Moses Mabhida Stadium is an iconic multipurpose stadium in Durban, KwaZulu-Natal and is shaped like a basket. It was constructed as one of the hosts for the 2010 FIFA World Cup and is currently the home stadium for the AmaZulu Football Club, a professional South African soccer team. The stadium is named after Moses Mabhida, a former General Secretary of the South African Communist Party, who helped to forge and maintain the powerful United Front that eventually saw the creation of a democratic and non-racial South Africa. The stadium design includes: seating capacity of 56000, but can be up-scaled to 85000 for major events such as the Olympic Games. allowance for natural ventilation and creates an incredible sense of space. the iconic arch whose shape was inspired by the Y shape on the South African flag. the roof which is made of 46000 m^2 of Teflon-coated glass fibre membrane that produces a translucent glow when the stadium is lit up. the grand centre arch, 106 m high, is not just a design feature. The SkyCar takes visitors up to its highest point, where they can get out and enjoy breath taking, panoramic views of the city and ocean. 120 luxury suites and business clubs, providing 7500 VIP seats. the colour arrangement of the seating conceptualised to look like the sea flowing onto the beach. Each seat that is spacious and comfortable, providing a clear line-of-sight to the pitch. With a total area facade of 15000 m2 and a 46000-m2 roof membrane, the icon that has set the hearts of Durbanites glowing with pride used 245141 t of concrete and 9978 t of reinforcing steel more than the quantities used on the Eiffel Tower! During construction, over 26000 jobs were created, reducing Durbans unemployment statistics by 2,12%. At its highest point of 106 m, the arch which symbolises the union of a once-divided nation is higher than the 93-m Statue of Liberty and, at 360 m long, it is the longest arch in the world. Speaking at a media briefing at the stadiu, Julie-May Ellingson, head of the strategic projects unit and the 2010 programme at the eThekwini municipality, said the total R3098212753 bill was about R1-billion less than it had cost to build Cape Towns Green Point stadium. Ellingson said that major hurdles had been time and money constraints. Rain and wind caused a lot of delays and we were affected by two strikes which put us back quite badly, she said' QUESTION 6(20 marks) A project has key characteristics that we are familiar with. Relate and examine these characteristics in a project. answer based on below key characteristics. A project therefore has some key characteristics, which includes:
It is temporary in nature which means that it has a definite start and an end
It exists for a particular purpose and needs to achieve a defined objective or to meet some needs; and
It is planned and executed over a period of time through a collection of individual tasks According to Roberts (2019), all projects have some common elements namely:
An objective: A definable end result, output or product, which is defined in terms of cost, quality and timing
Complexity: Several tasks are required to be undertaken to achieve the objectives. The relationship between all these tasks can be extremely complex
Uniqueness: A project is usually a one-off undertaking
Uncertainty: As all projects are planned before they are executed, they carry a certain amount of risk
Life cycle: Projects normally go through three stages planning, execution and stage-out; and
Temporary nature: Resources may be moved from one project to the next once the tasks have been completed

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!