Question: Casing SizeCasing DepthShoe Track LengthHole SizeExcess Volume Required ( percent ) Spacer VolumeSpacer DensityWell Fluid / Displacement Fluid DensityRequired Cement Fill - Up ( LEAD

Casing SizeCasing DepthShoe Track LengthHole SizeExcess Volume Required (percent)Spacer VolumeSpacer DensityWell Fluid/Displacement Fluid DensityRequired Cement Fill-Up (LEAD)Lead DensityLead YieldWell ParametersLead Water RequirementRequired Cement Fil-up (TAIL)Tail DensityTail YieldTaill Water Requirement9.625 inch19506514.256010.59.2125011.52.6015.4570015.21.054.2736 lb/ftfeetfeetinchbarrelsIb/galIb/galfe
\table[[Well Parameters],[Casing Size,9.625 inch,36 lb/ft],[Casing Depth,1950,feet],[Shoe Track Length,65,feet],[Hole Size,14.25,inch],[Excess Volume Required (percent),60,%],[Spacer Volume,30,barrels],[Spacer Density,10.5,lb/gal],[Well Fluid/Displacement Fluid Density,9.2,1b/gal],[Required Cement Fill-Up (LEAD),1250,feet],[Lead Density,11.5,lb/gal],[Lead Yield,2.60,ft3sketIb/galft/skgal/skfeetIb/galft/skgal/sk. what is the volume of lead cement in sacks
Casing SizeCasing DepthShoe Track LengthHole

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!