Question: cause 1. The interaction between the faulted system and its distributed capacitance may transient overvoltages (several times normal) to appear from line to ground during

cause 1. The interaction between the faulted system and its distributed capacitance may transient overvoltages (several times normal) to appear from line to ground during normal switching of a circuit having a line-to ground fault (short). These over voltages may cause insulation failures at points other than the original fault. 2. A second fault on another phase may occur before the first fault can be cleared. This can result in very high line-to-line fault currents, equipment damage and disruption of both circuits. Disadvantage: This system involves all the drawbacks and hazards of high earth fault current: maximum damage and disturbances. There is no service continuity on the faulty feeder. The danger for personnel is high during the fault since the touch voltages created are high. Applications: Distributed neutral conductor. 3-phase+neutraldistribution. Q.1.4 Using suitable example/s differentiate between structural testing and functional testing

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Programming Questions!