Question: CDO 4: Consider a situation with subprime loans are packaged into an MBS with the MBS Mezzanine tranche repackaged into a CDO. The MBS is
| CDO 4: Consider a situation with subprime loans are packaged into an MBS with the MBS Mezzanine tranche repackaged into a CDO. The MBS is 80% Senior, 15% Mezzanine, 5% Equity. The CDO takes that 15% mezzanine and tranches it into 66.66% Senior, 20% mezzanine and 13.33% Equity. Assume that the default rate on the subprime mortgages is 40%. Because house prices have dropped such that the recovery rate on defaulted loans is 50%. The Mezzanine tranche of the MBS CDO lost _%. (Round to nearest whole percent with no formatting)
Can You Please Show Each Step? Thanks! |
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
