Question: CE 3 8 2 Hydraulic and Hydrologic Engineering Homework # 9 ( 1 0 Points ) A residential subdivision of 8 0 0 homes will

CE 382
Hydraulic and Hydrologic Engineering
Homework #9(10 Points)
A residential subdivision of 800 homes will be constructed with sewer service. The subdivision data is as follows:
a. Estimated average water demand is 120 gallons per-capita-day (GPCD)
b. Residential density is 2.3 persons per residential dwelling
c. Peaking factor is 2.0
d. Sewer discharge is 68% of water demand
e. Grade of the sewer line is 0.0025
f. Manning n=0.010.
g. Available pipe sizes 6",8",10",12"
Find the following:
(a) Size of the sewer such that the pipeline will flow less than 75% full at peak demand.
(b) Flow velocity at peak discharge.
(c) Normal depth of flow.
Note: Show all your calculations.
CE 3 8 2 Hydraulic and Hydrologic Engineering

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!