Question: CE 4 4 2 Homework No . 8 Spring 2 0 2 4 The Eastern NM Rural Water System, known as the Ute Pipeline, is
CE Homework No
Spring
The Eastern NM Rural Water System, known as the Ute Pipeline, is a proposed project to pump AFyr from Ute Lake south & east to provide water for Clovis, Portales & points south see map The first step involves pumping the water from Ute Reservoir elevation up over the top of the caprock elevation through a mile pipeline. From there it will flow by gravity to a treatment plant and then to points south. Answer the following.
a Assuming water is available only months of the year, calculate the flow in cfs ie AF months
b To limit head losses the maximum allowable velocity is Calculate the necessary pipe diameter, then round up to the nearest to get the pipe to be used in the rest of the problem.
c Assuming ductile iron pipe calculate the head losses to the top of caprock.
d Calculate pump head ft
e Calculate hydraulic power in units of hp and KW
f Assuming a pump that is efficient calculate the motor horsepower in units of and
g Assuming an average electric power cost of $ calculate the annual electric power cost to pump the water to the top of the caprock.
h Assuming the average household uses galmonth what would be the monthly household water bill just to pay for pumping costs?
The flow and chlorine concentrations at a pipe junction are shown. Calculate and the chlorine concentrations in pipes and leaving the node.
A venturi meter has a pipe diameter of in and a throat diameter of Use the discharge coefficient as plotted in RCC Figure page of my notes to calculate a rating curve consisting of a plot of psicfs for flows from to
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock