Question: ( Ch . 7 . 1 0 Prob ) : Floor - On . Ltd . , operates a line that produces self - adhesive

(Ch.7.10 Prob): Floor-On. Ltd., operates a line that produces self-adhesive tiles. This
line consists of single-machine stations and is almost balanced (i.e. station rates are
nearly equal). A manufacturing engineer has estimated the bottleneck rate of the line to
be 2,000 cases per 16-hour day and the raw process time to be 30 minutes. The line has
averaged 1,700 cases per day, and cycle time has averaged 3.5 hours. (30pt, Hint:
quantitative answers)
(a) What would you estimate average WIP level to be?(Hint: WIP=TH x CT)
(b) How does this performance compare to the practical worst case?
Hint:
THPWC=wW0+w-1rb
(need to calculate rb,T0,W0)
(c) What would happen to the throughput of the line if we increased capacity at a non-
bottleneck station and held WIP constant at its current level?
(d) What would happen to the throughput of the line if we replaced a single-machine
station with four machines whose capacity equaled that of the single machine and
held the WIP constant at its current level?
(e) What would happen to the throughput of the line if we began moving cases of tiles
between stations in large batches instead of one at a time?
 (Ch.7.10 Prob): Floor-On. Ltd., operates a line that produces self-adhesive tiles.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!