Question: ( Ch . 7 . 1 0 Prob ) : Floor - On . Ltd . , operates a line that produces self - adhesive
Ch Prob: FloorOn Ltd operates a line that produces selfadhesive tiles. This
line consists of singlemachine stations and is almost balanced ie station rates are
nearly equal A manufacturing engineer has estimated the bottleneck rate of the line to
be cases per hour day and the raw process time to be minutes. The line has
averaged cases per day, and cycle time has averaged hours. Hint:
quantitative answers
a What would you estimate average WIP level to beHint: WIPTH x CT
b How does this performance compare to the practical worst case?
Hint:
need to calculate
c What would happen to the throughput of the line if we increased capacity at a non
bottleneck station and held WIP constant at its current level?
d What would happen to the throughput of the line if we replaced a singlemachine
station with four machines whose capacity equaled that of the single machine and
held the WIP constant at its current level?
e What would happen to the throughput of the line if we began moving cases of tiles
between stations in large batches instead of one at a time?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
