Question: ( Ch . 8 . 1 0 Prob ) : Consider a simple two - station line as shown in below ( Two - station

(Ch.8.10 Prob): Consider a simple two-station line as shown in below (Two-station line
with a finite buffer).(30pt)
Both machines take 20 minutes per job and have SCV=1. The first machine can always
pull in material, and the second machine can always push material to finished goods.
Between the two machines is a buffer that can hold only 10 jobs (see Section 8.7.1).
a) Model the system using an MM??1b queue. (Note that b=12, considering the two
machines.)
i. What is the throughput?
ii. What is the partial WIP (i.e. WIP waiting at the first machine or at the second
machine, but not in process at the first machine)? Hint: WIPP =b2
iii. What is the total cycle time for the line (not including time in raw material)?
(Hint: Use Little's Law with the partial WIP and the throughput and then add the
iv. What is the total WIP in the line? (Hint: Use Little's Law with the total cycle time
and the throughput.)
 (Ch.8.10 Prob): Consider a simple two-station line as shown in below

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!