Question: Chapter 2 : Page 4 4 , Example 2 - repeat the steps given in Example to calculate the streamflow for the months of February,

Chapter2: Page 44, Example 2- repeat the steps given in Example to calculate the streamflow for the months of February, March, April 2015.
EXAMPLE 2.2
The average monthly precipitation data recorded at the Whippany River Basin (drainage area 29.4mi2) at Morristown, New Jersey, during 2015 are given below. The monthly computed potential evapotranspiration values for the basin are also indicated. The model parameters are: a=0.98,b=25,c=0.10, and d=0.35. Initial soil moisture storage and groundwater storage are ascertained to be 7.8 and 1.5 in., respectively. For each month, determine (a) moisture storage, (b) direct runoff, (c) groundwater recharge, (d) groundwater storage, (e) groundwater discharge, and (f) streamflow.
\table[[Month:,J,F,M,A,M,J,J,A,S,O,N,D],[Precipitation (in.),1.2,2.2,0.2,0.75,0.1,0.6,7.0,7.8,5.7,0.88,0.48,5.5],[Potential evapotranspiration,1.92,1.96,2.3,2.4,3.3,3.4,3.9,4.0,3.0,2.1,1.93,1.95],[(in.),,,,,,,,,,,,]]
SOLUTION
The computations are made for successive periods; monthly for this problem.
For January 2015:
From eq.(2.6),
W1=P1+S0=1.2+7.8=9.0in.
From eq.(2.8),
From eq.(2.9), soil moisture storage,
S1=8.90e-1.9225.0=8.24in.
From eq.(2.10), groundwater recharge,
(GR)1=0.10(9.0-8.9)=0.01in.
From eq.(2.11), direct runoff,
or
(0.09in.)29.4mi21ft12in.,52802ft21mi2,6.15106ft3
or
6.15106ft3month1month31246060sec,2.30cfs
From eq.(2.12), groundwater storage,
or
G1 depth drainage area
1.12in.29.4mi21ft12in.52802ft21mi2
76.5106ft3
From eq.(2.13), groundwater discharge,
()1
Similar computations are performed for the month of February with starting values of S and G as 8.24 and 1.12, respectively, and so on.
Chapter 2 : Page 4 4 , Example 2 - repeat the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!